Home
of
S/V Unforgettable
Catalina 25 #1883
WCX-9246
|
Standard rig
Swing keel
Built in 1980
in Woodland Hills, CA |
Refit in 1998:
New
cushions
New running rigging
New hatch closures
Stripped 7 coats of bottom paint
Repaired blisters
Repaired fiberglass dings and chips
Painted the decks
Reapplied non-skid
New safety equipment including New overboard
equipment
Oiled all interior teak
Cleaned bilges
Coated all interior surfaces with acrylic sealer
Installed AM/FM/CD Player sound system
Installed new safety gear including reserve
antenna
Installed new antenna splitter
Installed cockpit floodlight socket
Rebuilt bilge pump
Reseated portlight
Installed all new lighting and lenses
Installed new motor mount
Repainted bottom with ACT
|
Refit in 1999:
North
Sails Mainsail
North Sails 155% Genoa Jib
CDI FF4 Roller furler
Lewmar Winch overhaul
Fiberglass ACT bottom paint
Teak oiled interior
Applied acrylic
deck sealer
New interior pillows and bedding
Patched deck w/Marine Tex
Acid washed hull & topsides
Repaired anchor locker lid
New running rigging (Sta-Set X Halyards &
downhaul)
CETOL coated exterior teak
Varnished tiller & motor mount
Overhauled Yamaha 9.9hp motor
Re-seated rudder pintles
Spray-painted keel slot
New locks
New ryc Burgee
New Yacht Ensign and mount
New keel
retractor cable
New keel pin
New turning ball and pin
Keel scaped, primed, and painted
done
by Lockwood Boat Works
|
Refit in 2000:
North
Sails TrueMax Radial Cruising Gennaker
New Ronstan Boom Vang
Keel scraped and primed
Gel coat dings repaired
Forward thru hull rebedded
Installed Standard wind guage at masthead and cockpit
Acid washed hull & topsides
Prepped hull for Poli coating
Applied poliglas coating
Bottom painted w/ACT
New spinnaker halyard & block
New Schaeffer spinnaker sheet blocks
New spinnaker sheets
New mainsail cover
Rebuilt keel trunk
Patched gel coat around keel
Patched fiberglass around keel trunk
Installed new keel bushing
Machined keel bushing and faired
Machined new pennent attachment
Re-installed keel cable
Installed new keel cable pennant
* Fiberglass work
and machine shop work contracted to
Lockwood
Boat Works |
Refit in 2001:
New
mainsail cover
New standing rigging
New jacklines
New lifelines
Fiberglass
& gelcoat repairs
Poligrlass the topsides
Repair mast wiring
Inspect and replace lightbulbs
Cetol exterior teak.
Replace wire halyards with lines.
Install new furler fairleads.
Reorganize lazarrette storage.
Reorganize interior storage.
Install new instruments in cabin.
Tighten rudder gudgeons.
* Fiberglass work and
standing rigging work contracted to
Lockwood
Boat Works
* Sailcover,
jacklines, and lifeline cushions contracted to
Egger's
Sail Loft.
|
Refit in 2002:
Install
new thru-deck plugs for wiring.
Install outhaul gear.
Install new mainsheet gear.
Install new tiller brake.
Poliglass hull and topsides.
Prime keel w/zinc primer
Bottom painted with ACT
Cetol on all exterior wood
|
Refit in 2003:
Repaired
keel saddles
Added reefing gear to main
Replaced speakers
Recharged and conditioned batteries
Painted outboard motor
Washed and poliglassed hull
Primed and painted keel
Full bottom coat of Micron CSC
New winter cover
Painted bilges with white bilgekote
Cleaned interior
Cetol on all exterior wood
|
Refit in 2004:
Overhauled outboard motor
New water pump
New impeller
New PFD's (inflatables)
New GPS (Garmin 76S)
To Do:
Paint cockpit
Paint / refinish hull
Install new hatch (plexiglas) for v-berth
Install new thru-deck plugs for wiring
|
|